INSTRUCTIONS TO BIDDERS
A. GENERAL
1.Scope of Bid
1.1 HA-Somalia invites bids for the construction of Iqra school in Baladxawa, Gedo, Jubaland,
Somalia.
1.2 The material/goods are specified in greater details in the Sub Section of the Bid
Documents.
1.3 The successful Bidderis expected to complete the supply by the Intended Completion date
which is given in the section II, effective from the signing of Contract.
2.Eligible Bidders
2.1 This Invitation for Bids is open to companies with experience in construction of Iqra
school in Baladxawa, Gedo, Jubaland, Somalia.
2.2 Bidders shall not be under a declaration of ineligibility for corrupt, fraudulent and coercive
practices issued by HA-Somalia.
2.3 Bidders shall not be involved in criminal acts/activities or associated with individuals
and/or entities associated with criminal activities.
3.Corrupt, Fraudulent, Collusive and Coercive Practices
3.1 HA-Somalia requires that all; HA-Somalia staff, bidders, suppliers or distributors, observe
the highest standard of ethics during procurement and execution of all contracts. HASomalia shall reject any Bids put forward by Bidders or where applicable terminate their
contract, if it is determined that they have engaged in corrupt, fraudulent, collusive or
coercive practices.
4. The selection criteria for construction of Iqra school in Baladxawa, Gedo, Jubaland,
Somalia:
4.1 Technical Capacity and Workmanship Standards:
The contractor must demonstrate:
Proven experience constructing schools, classrooms, administration
blocks, toilets, and parade grounds.
Ability to meet engineering standards and ensure high-quality workmanship for
every stage of construction.
5 Iqra School Development Initiative – Somalia
(SO-26-407-01)
4.2 Occupational Health, Safety & Environmental Protection:
The contractor must comply with OHS and environmental standards:
Use of PPE for all workers.
Controlled access to protect the community, especially children.
Safe storage of materials, fuel, and equipment.
Mitigation measures for dust, noise, and waste.
Proper disposal of construction debris and wastewater.
Emergency response measures on-site.
4.3 Equipment, Tools & Machinery Capability:
The company must have access to adequate equipment required for:
Excavation (for foundations, footings, latrine pits).
Concrete mixing and compaction.
Timber and steel fabrication works.
Roofing installation.
All machinery must be operational and safe.
4.4 Delivery Timeline and Work Plan:
The contractor must submit a detailed schedule including:
Excavation and foundation preparation
RCC works (beams, slabs, columns, etc.)
Masonry construction
Roofing and ceiling installation
Electrical and plumbing works
Toilet construction and parade ground preparation
Finishing and painting
Visibility works (Human Appeal logos)
Failure to meet agreed timelines may lead to penalties or contract termination.
4.5 Financial Capacity and Pricing Consistency:
The company must demonstrate:
Pricing that is transparent, competitive, and aligned with the section ii
items.
Financial stability to complete the project without delays.
6 Iqra School Development Initiative – Somalia
(SO-26-407-01)
4.6 Legal Requirements and Registration:
Eligible contractors must provide:
Valid company registration in Gedo, Jubaland /Federal registration.
Updated tax compliance documents(Gedo, Jubaland /Federal registration).
Licenses for construction activities.
Compliance with local government and Ministry of Public Works standards.
Proof of insurance (workers, equipment, third-party liability).
4.7 Past Performance and Experience:
Selection will favor contractors with:
Demonstrated success in constructing similar school facilities.
Experience in remote regions like Gedo.
Positive references from INGOs, NGOs, or government projects.
4.8 Commitment to Community and Cultural Considerations:
The contractor must:
Respect community leadership and cultural norms.
Engage local communities during implementation.
Employ local labor wherever possible.
Ensure construction does not disrupt nearby homes, schools, or
institutions.
4.9 Additional Project-Specific Considerations (As per BOQ):
The selection will also consider the contractor’s ability to construct:
8 classrooms as per design
6 toilets with privacy walls as per design
Construction administrative block with staff rooms as per design
Parade ground with flag
Full interior & exterior finishes
Visibility with HA logo (3m x 3m)
.
7 Iqra School Development Initiative – Somalia
(SO-26-407-01)
B. THE BIDDING DOCUMENTS
SUBMISSION OF BIDS