Date: 23 November 2026
IFB No.: [MoWR-S.land/D.Q/2026/036]
Project: Sustainable Access to Water for Rural Communities (Project No. 01004092)
Contract: Qalocato Village Water Supply, Maroodi jeex Region – Lot 1 and Lot 2
| Lot | Works |
|---|---|
| Lot 1 | Hydrogeological survey; drilling of one borehole to about 500 m, with the first 30 m Supply and install 14" steel surface casing (min 6 mm wall, with centralizers and grouting) .steel casing, screens and gravel pack; development, 24-hour pumping test and water quality analysis; supply and installation of an 26 kW submersible pump with 2" GI riser pipes; RCC well head; and a well completion report. |
| Lot 2 | Construction of a 38.4 m³ reinforced concrete elevated water tank, two water kiosks, a camel trough, a goat and sheep trough, an operation office with store and generator room, water transmission and distribution pipelines with valves and fittings, and a generator 100kvA system to run the Lot 1 pump. |
Address for bid submission and enquiries:
Eng: Abdirahman A. Bashe Muruqliqe, Ministry of Water Development , Republic of Somaliland
Sha'ab Area, Behind Ministry of Public Work Land Housing Opposite Ministry Of Defence
Email: cabdirooblebaashe@gmail.com Tel: +252 634488887
Cc : dg.mowd@sldgov.org